01

First Few Days

We will be contacting building control to arrange a pre-work visit,

We start the project by stripping out any fixed items, such as stone shelving, ceiling surfaces, wall covering ie boards,

Any plumbing or electrical items are made safe and disconnected,

We break any existing floor surfacing such as concrete or stone, we then begin to excavate the subfloor to the desired levels,

02

Structure

We carry out any structural work if necessary, such as removing walls, creating new opening etc

 

if necessary, at this stage we would also carry out any underpinning work and foundation reinfocement work,

All our structural work is designed and calculated by a structural engineer

03

Preparations

The walls are been prepared with moisture management system, (cavity drain membrane)

together with parameter drainage system which will carry away any water gatherring in the channels,

 

Also at this point, we will arrange for a visit from building regulation inspector for an aproval go ahead with next step, Concrete,

04

New Floor

A new concrete floor is now been poured, and will dry withing 48hr ready for us to walk on and move on to next stage.

Insulation is applied on top of the new floor cavity drain membrane,

A new 18mm chipboard flooring is laid on top of the insulation creating a warm floor system, 

This floor finish is a great base for your finished flooring, ie, carpet, LVT (luxury vinyl tile) laminate flooring, and engineered hardwood, just to note: for tiling over, you will need to apply a cement-based board or element board under the tiles, to give a waterproofed factor.

05

1st Fix Joinery

A new concrete floor is now been poured, and will dry withing 48hr ready for us to walk on and move on to next stage.

Insulation is applied on top of the new floor cavity drain membrane,

A new 18mm chipboard flooring is laid on top of the insulation creating a warm floor system, 

This floor finish is a great base for your finished flooring, ie, carpet, LVT (luxury vinyl tile) laminate flooring, and engineered hardwood, just to note: for tiling over, you will need to apply a cement-based board or element board under the tiles, to give a waterproofed factor.

06


Wall & Ceiling Covering

This is an exiting stage, the drylinning or plasterboarding as we call it :) 

At the end of this stage the client will get to see finally the vision becomes reality, as the basement gets it shape and size definitions,

The next stage is the finish plaster and probably the most important stage, as we only have on chance

to get the right finish on the walls and ceilings, ( We trust our plasterers greatly)

07

2nd Fix Joinery

At this stage, a number of tasks are completed,

  • 2nd fix joinery is carried out, to include any bespoke storage solutions, new doors, skirting boards, architrave, and finished flooring covering, we cover all aspects of finished flooring installations apart from carpets.
  • Kitchen fitting,
  • 2nd fix electrics are installed, sockets, switches, and light fittings,
  • 2nd fix plumbing to include new radiators, bathroom installation, utility room items,

08

Final Touches

This is the final part, decorating, we do not employ a decorator, however, we can recommend one for you,

It is time to collect the last payment and hand over the keys,

An electrical certificate will be emailed to you to submit to building control,

ones the inspector has visited and gave a thumb's up, they always do :)

he will then provide you a completion certificate for your safe keep, you will need this certificate if you're planning to sell your house at any point in the future,

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.